Gravel Shed Base: Stone, Depth and How Much

A gravel shed base drains water away from the wood and needs no concrete. Here is the size, the depth, which stone to order, how much of it, and what it costs.

By The Shed PlannerUpdated 16 min readChecked against 15 sources

A gravel shed base of crushed stone inside a treated timber frame in a backyard, ready for the shed skidsIllustration

The short answer

A gravel shed base is a compacted pad of crushed stone that runs 12 inches past the shed on every side. The designer figures 4 inches deep once compacted, which is 2.07 cubic yards for a 10x12 shed, and orders a third more loose stone, 2.8 cubic yards, because crushed stone loses about a quarter of its loose depth when compacted. In bulk that was $195.86 at one supplier before delivery; in 0.5 cubic foot bags it is 152 bags.

A gravel shed base is a pad of compacted crushed stone under the floor frame of your shed. Pressure-treated skids sit on top of it, the floor frame sits on the skids, and the stone carries water away from the wood. You buy stone and fabric, rent a compactor, and skip the concrete truck. It is the cheapest permanent-feeling foundation most backyard sheds can have.

This guide gives you the pad size, the depth, the stone to order by name, the cubic yards, tons and bags for the sheds people actually build, what that costs, and the build from stakes to skids. The numbers come from the shed designer, so they match the cut lists on our free plans, and the calculator below works out any other size. For the rest of the foundation options, start with the shed foundation guide. If you are comparing every kind of shed base, from paving slabs to plastic grids and timber frames, or building in metres, the shed base guide covers them all.

A gravel base for a shed at a glance

Each line is explained further down the page. Your building department overrides any of them.

What Number Where it comes from
Pad size Shed footprint plus 12 in on every side The designer
Depth 4 in compacted; 6 in on soft or low ground The designer; common practice
Stone Angular crushed stone, never round pea gravel U.S. Forest Service guidebook
Order A third more loose stone than the compacted volume Penn State road-aggregate bulletin
10x12 shed 2.07 cu yd compacted, order 2.8 cu yd loose The designer
Weight 1.4 to 1.5 tons per cubic yard HomeGuide, Dec 2025
Lifts About 2-1/2 in loose, compacted to 2 in each The plan PDF
Level Within 1/4 in end to end The plan PDF
Skids 4x6 treated for ground contact, on edge, 4 for a 10 ft wide shed The designer; AWPA UC4A

Is a gravel shed base right for your shed

Yes for most backyard storage sheds. The gravel does the draining and the skids do the carrying. Before you dig, check that your shed, your ground and your town agree.

When a gravel base works

A gravel shed base suits flat or gently sloping ground where water drains away instead of pooling. The designer’s skid foundation is built on exactly this idea: 4x6 pressure-treated skids set on edge, running front to back, with a 2x6 pressure-treated floor frame on top. The shed rests on the ground instead of being anchored to footings, which is why it is called a floating foundation.

Walk the spot after a hard rain. If water stands there, the pad will need to be raised and the ground around it graded away from it, or you should pick another spot.

Can a shed sit directly on gravel

A wood shed’s floor frame should not touch the stone. The skids touch it, and they are the only part made for that: the AWPA’s UC4A category covers wood in contact with the ground, and pressure-treated lumber rated for it is what the designer’s parts list assumes. The 5-1/2 in of skid also lifts the joists off the pad so air can move under the floor. A resin or metal kit that ships with its own floor is different; follow its manual.

When to choose something else

Steep slopes, soft fill, and buildings you plan to heat, plumb or load with heavy machinery are the cases where you should look at deck blocks, piers or a slab. The designer offers two floor types, skids on gravel and beams on deck blocks, and nothing else, so for a slab or piers you plan the foundation on your own.

Gravel or concrete for a 10x12

Gravel pad and skids Concrete slab, 4 in
Material 2.8 cu yd of loose crushed stone 1.48 cu yd of concrete
Cost $195.86 for the stone at one supplier, before delivery $720 to $960 installed at HomeGuide’s 2026 rate
Tools Rented plate compactor, rake, level Forms, mixer or truck, float, edger, groover
Ready to build on The same day After days of cure
Drains Through the stone Off the surface

A slab wins when your town requires a permanent foundation or you want a concrete floor. Our concrete slab for a shed guide covers thickness, concrete and cost for every size.

Does a gravel shed base pass your building department

That depends on where you live. One city accepts a gravel base outright, and another waives the permanent foundation only when conditions are met.

  • Elgin, Illinois defines a shed as an accessory structure of no more than 150 sq ft, and its quick guide says “a gravel base with code-approved tie-downs is an acceptable foundation.” The same guide accepts a concrete slab at least 4 inches thick on a minimum 4 inch compacted gravel base (City of Elgin, Shed Quick Guide, checked 2026).
  • Prince William County, Virginia exempts sheds up to 256 sq ft from a permanent foundation when five conditions are met. They include a floor no more than 18 inches above grade, ground-contact treated wood where it touches the soil, and anchoring for wind loads (Prince William County Development Services, Guidelines for Building a Shed, 2021).
  • The model code (2021 International Residential Code, section R105.2) exempts one-story detached accessory structures up to 200 sq ft from a building permit. The same section says the exemption does not authorize work that violates the code or other local laws.

Two different questions hide in those examples: whether you need a permit at all, and what foundation the local rules accept. Your town can answer yes on one and no on the other. Thresholds and foundation rules vary by jurisdiction, so call the building department and read our shed permit basics before you buy stone.

How big and how deep should a gravel shed base be

Build the pad a foot bigger than the shed on every side and at least 4 inches thick. The size is simple arithmetic. The depth depends on your soil and your local rules.

Pad size

The designer sizes the pad as the shed footprint plus 12 inches on every side. An 8x10 shed gets a 10x12 pad, a 12x16 shed gets a 14x18 pad. The extra foot gives you room to walk and work around the walls, keeps the outer skids and rim joists well inside the stone, and lets rain run off the pad instead of undercutting its edge.

Measure the footprint from the outside of the floor frame, then add 12 inches to each side. Mark the pad corners with stakes and run string between them.

Pad depth

The designer figures the pad at 4 inches thick. Common practice for a gravel shed base is 4 to 6 inches of compacted stone. Four inches is the depth the designer uses, and it is the depth Elgin, Illinois names for the compacted base under a slab. Go toward 6 inches when the ground is soft, when the spot is low, or when you want the shed higher above the surrounding grade.

Depth is what the pad ends up at after compaction, not the depth of loose stone you dump. Building codes and local rules can ask for more, so treat 4 inches as a floor you confirm, not a promise of compliance.

Is 2 or 3 inches enough

Two inches is half the common 4 inch practice, and over soft spots it leaves skids sitting almost on soil. The stone you save by going thinner is small: on a 10x12 pad, dropping from 4 to 3 inches saves about half a cubic yard, about $36 at the bulk price below. Build the 4 inches.

What size gravel for a shed base

Use crushed stone with sharp, angular faces, about 3/4 to 1 inch and down. Do not use round pea gravel or river rock for the pad. The next three sections explain why, and what to ask for by name.

Stone for a gravel shed base: a heap of angular crushed stone with fines that locks together, next to round pea gravel that rolls apart.Illustration

Crushed stone, not pea gravel

The U.S. Forest Service’s Equestrian Design Guidebook (2007) is a guide to equestrian trails and trailheads, not to sheds, but it explains the material clearly. It calls round gravel “a poor choice for trails, roads, parking areas, and parking pads because it doesn’t compact well,” because the rocks roll against each other. It says crushed rock, with its angular faces, compacts relatively well and suits subbases for parking areas and parking pads. A shed pad asks the same thing of the stone as a parking pad does: stay put under load.

Clean stone or a base with fines

Crushed stone is sold in two families, and the difference is the dust. A state highway specification shows it in numbers. In the North Carolina Department of Transportation’s5 Table 1005-1, size No. 57 stone passes a 1-1/2 inch sieve completely, 95 to 100 percent passes 1 inch, 25 to 60 percent passes 1/2 inch, and almost nothing, 0 to 0.6 percent, passes the No. 200 sieve that measures dust. It is a clean stone of about one size. The aggregate base course (ABC) in the same table runs from 1-1/2 inch down to dust, with 4 to 12 percent passing No. 200.

Two stones for a gravel shed base: clean No. 57 crushed stone with open gaps, and a crushed base with fines that packs solid.Illustration

The same Forest Service guidebook says crushed rock combined with fines and well compacted is generally preferred for surface courses on parking pads, and warns against crushed rock without fines as a surface because it does not compact well. Fines are the stone dust and small particles that fill the gaps between larger pieces. For a shed pad that means:

Stone What it is On a shed pad
Crushed base with fines (crusher run, crush and run, ABC) Angular stone from about 1-1/2 in down to dust Packs into the firmest, most level bed for skids; drains through less freely
No. 57 crushed stone Angular, about 1 in and down, almost no dust Drains fastest and stays put better than round stone, but stays looser under a compactor
3/4 in crushed stone Angular, clean, the size the designer prices Behaves like No. 57; ask whether it is washed or has fines
Pea gravel, river rock Round Rolls under the skids; skip it for the pad
Bagged paver base Compactable base in 0.5 cu ft bags Fine for a small top-up; expensive for a whole pad

If your yard drains well, a compactable base with fines gives the firmest pad. If it stays wet, tell your supplier; they know which of their products drains and which packs in your soil.

What to ask your supplier for

Names change from region to region: crusher run, crush and run, dense grade, ABC, 21A, 2A and other local codes can all mean a crushed base with fines, and their gradations differ by state. So do not order by a name you read online. Call a local aggregate supplier, say you are building a compacted base for a shed pad, and ask which product they sell for that. Ask for its weight per cubic yard while you have them on the phone. Bagged decorative pea gravel and river rock at a garden center are meant to look good on top of the ground; stone for a base comes from an aggregate supplier by the cubic yard or the ton, delivered by truck.

How much gravel do you need

To get cubic yards, multiply the pad length in inches by the pad width in inches and the depth in inches, then divide by 46,656, the number of cubic inches in a cubic yard. The pad is the shed footprint plus 24 inches in each direction. This table applies that math to all 24 gable sizes in our free plans, at 4 inches, the depth the designer uses, and at 6 inches. The last column is what the designer’s list orders for the 4 inch pad: loose stone, a third more than the compacted volume, rounded up to a tenth of a yard.

Shed Pad, ft Sq ft Yards, 4 in Yards, 6 in Order, loose, for 4 in
6x6 8x8 64 0.79 1.19 1.1
6x8 8x10 80 0.99 1.48 1.4
6x10 8x12 96 1.19 1.78 1.6
8x8 10x10 100 1.23 1.85 1.7
8x10 10x12 120 1.48 2.22 2.0
8x12 10x14 140 1.73 2.59 2.4
8x14 10x16 160 1.98 2.96 2.7
10x10 12x12 144 1.78 2.67 2.4
10x12 12x14 168 2.07 3.11 2.8
8x16 10x18 180 2.22 3.33 3.0
10x14 12x16 192 2.37 3.56 3.2
12x12 14x14 196 2.42 3.63 3.3
10x16 12x18 216 2.67 4.00 3.6
12x14 14x16 224 2.77 4.15 3.7
12x16 14x18 252 3.11 4.67 4.2
10x20 12x22 264 3.26 4.89 4.4
10x24 12x26 312 3.85 5.78 5.2
12x20 14x22 308 3.80 5.70 5.1
16x16 18x18 324 4.00 6.00 5.4
14x14 16x16 256 3.16 4.74 4.3
14x20 16x22 352 4.35 6.52 5.8
12x24 14x26 364 4.49 6.74 6.0
16x20 18x22 396 4.89 7.33 6.6
16x24 18x26 468 5.78 8.67 7.8

Sq ft is the pad area, and yards are cubic yards. The 4 and 6 inch columns are volumes for the finished, compacted pad, with nothing for waste; the last column is the loose stone to order for the 4 inch pad.

Calculator

Gravel calculator

Shed size in feet. The pad runs 12 inches past the shed on every side, the same rule as the table above.

Pad depth, compacted
shed 10 x 12 ftpad 12 ft14 ft12 in each side

Finished pad, compacted

2.07 cu yd
Pad size
12 x 14 ft
Pad area
168 sq ft

Compacted volume. Crushed stone loses about a quarter of its loose depth when compacted (Penn State compacts an 8" loose lift to 6"), so the designer's list orders a third more loose stone. Ask your supplier for their own figure, and order by their tons per cubic yard.

Order more than the finished pad

Compacting squeezes stone into a smaller volume, so the stone that arrives on the truck has to be more than the pad you finish. Penn State’s1 Center for Dirt and Gravel Road Studies builds this into its materials calculator: it uses densities and compaction ratios, lets you enter a compacted or a loose depth, and always reports cubic yards of loose material and US tons as shipped.

The designer uses one published ratio. Penn State’s1 2025 bulletin on driving surface aggregate shows a roller compacting an 8 inch loose lift to 6 inches. That is a third more loose stone than finished pad, so the designer’s list orders the compacted volume times 4/3: 2.8 cubic yards for the 10x12’s 2.07. That bulletin is about a dense road aggregate under a 10-ton vibratory roller; base stone under a hand plate compactor may settle differently. Tell your supplier the pad size and the compacted depth and ask how much loose stone that takes.

Yards, tons and bags

Quarries often sell by the ton, garden centers by the bag. HomeGuide’s3 December 2025 gravel price guide says one cubic yard holds 1.4 to 1.5 tons of stone; your supplier’s own figure for the product they quote beats that average. Bagged paver base comes in 0.5 cubic foot bags, 54 to the cubic yard.

Shed Order, loose cu yd About tons 0.5 cu ft bags
6x8 1.4 2.0 to 2.1 76
8x8 1.7 2.4 to 2.5 92
8x10 2.0 2.8 to 3.0 108
8x12 2.4 3.4 to 3.6 130
10x10 2.4 3.4 to 3.6 130
10x12 2.8 3.9 to 4.2 152
10x14 3.2 4.5 to 4.8 173
12x12 3.3 4.6 to 4.9 179
10x16 3.6 5.0 to 5.4 195
12x16 4.2 5.9 to 6.3 227
12x20 5.1 7.1 to 7.6 276
12x24 6.0 8.4 to 9.0 324
16x20 6.6 9.2 to 9.9 357
16x24 7.8 10.9 to 11.7 422

The number for your own size

For any size not in the table, use the calculator above or do the math by hand. A 9x14 shed has a pad of 11x16 ft, which is 132 inches by 192 inches. At 4 inches, that is 132 x 192 x 4 / 46,656, or about 2.17 cubic yards. Open the shed designer to see the skid count and the full material list for the same shed.

What a gravel shed base costs

Stone prices depend on the quarry, the haul distance and the delivery fee, so treat every number here as a dated example, not a quote.

Bulk or bags

The designer prices the pad two ways. East Coast Lumber & Building Supply (East Hampstead, New Hampshire) listed bulk 3/4 inch crushed stone at $69.95 per cubic yard on September 30, 2026, delivered in loads of 3 to 8 yards; the delivery fee was not on the page. At Home Depot’s Hamilton Mill store (ZIP 30011) the same day, a Pavestone 0.5 cubic foot bag of paver base was $6.47, or $5.82 each for 64 or more.

Shed Order, cu yd Bulk at $69.95 a yard Bags at $6.47
8x8 1.7 $118.92 $595.24
8x10 2.0 $139.90 $698.76
10x10 2.4 $167.88 $841.10
10x12 2.8 $195.86 $983.44
12x12 3.3 $230.84 $1,158.13
12x16 4.2 $293.79 $1,468.69
12x20 5.1 $356.75 $1,785.72
16x20 6.6 $461.67 $2,309.79

The East Coast Lumber minimum of 3 yards means any pad that needs 3 yards or less, from the 6x6 up to the 8x16, pays for 3 yards, $209.85 before delivery. Even so, bulk is a fraction of the bag price at every size; bags make sense only for a top-up or a tiny shed you cannot reach with a truck.

National ranges

HomeGuide’s3 2026 gravel guide, written by Sarah Noel, puts bulk crushed stone and gravel at $10 to $50 a ton and $15 to $75 a cubic yard, crush and run at $24 to $34 a ton, about $50 a yard, and delivery at $10 to $25 a ton, or free with a 5 ton minimum within 5 miles. It also warns that buying small quantities costs more than $100 a ton. Get two quotes for the delivered price, with and without spreading, and compare them per ton.

What else the pad needs

Landscape fabric to lay under the stone, a rented plate compactor for a day, stakes and string, and, if you edge the pad, treated timbers and spikes. The designer’s list prices a roll of landscape fabric sized to your pad under Foundation, and counts the pad stone under Site prep, outside the shed materials total.

Build the gravel pad step by step

The build is the same for every size: mark, dig, fabric, stone in lifts, compact, screed. The plan PDF prints these steps for your exact size, with the pad dimensions, the yards to order and the skid positions measured from the edge of the pad.

Before you dig

Call 811 a few business days before you break ground. It is the free national before-you-dig service, and it gets buried utility lines marked so your shovel stays off them (Common Ground Alliance, call811.com). Check your setbacks and the property line at the same time, so the pad does not end up in the wrong place.

A finished gravel shed base: a level pad of stone inside a timber frame, with landscape fabric under the stone, ready for the shed skids.Illustration

Steps

  1. Mark the pad

    Stake the four corners 12 inches outside the footprint on every side and run string between the stakes. Measure both diagonals and adjust the stakes until they are equal, so the pad is square.
  2. Strip the site

    Remove sod and topsoil inside the string, down to firm subsoil. Dig deep enough that the finished stone lands at your chosen depth, with the top a little above the surrounding grade so water leaves the pad.
  3. Rake the bottom flat and firm

    Fill soft spots with stone and tamp them. Do not leave loose dirt under the pad.
  4. Edge the pad, if you want a border

    Treated timbers staked around the outside hold the stone in and give you a straight edge to screed from. On sloping ground they also let you build up the low side.
  5. Lay landscape fabric

    Roll it across the whole bottom, overlap the seams, and run it up the sides. The fabric keeps soil from working up into the stone.
  6. Spread the stone in lifts

    The plan PDF calls for lifts of about 2-1/2 inches of loose stone, each compacted to 2 inches, so a 4 inch pad goes down in two lifts. Wet the stone lightly if it is dusty and will not settle.
  7. Compact every lift

    A rented plate compactor gives the best result. A hand tamper works on a small pad if you work slowly and cover every square foot.
  8. Screed the surface

    Drag a straight 2x4 across the stone and fill low areas until it stops rocking. Check the pad with a long level in both directions: the plan’s check is level within 1/4 inch end to end.
  9. Let it settle, then recheck

    Rain will settle the surface a little. Check level again before you set skids.

Check before you set skids

Check before you cut

Level the pad, then check the drain

A pad can be perfectly level and still hold water. Look at the ground around it. If the pad sits lower than the yard on one side, water will pour in and sit under the floor. Regrade the yard away from the pad or raise the stone on that side.

Skids on the pad, and tie-downs

Set 4x6 pressure-treated skids on edge on the finished pad, running from the front to the back of the shed. The designer uses 4x6 skids on edge for the skid foundation, with the floor joists running across them. Wood that touches the pad needs to be rated for ground contact: the AWPA category UC4A covers wood in contact with the ground, and pressure-treated lumber for that use is what the designer’s parts list assumes (Preserved Wood, AWPA Use Categories).

12' wide16' deepFRONT
Floor framing for a 12x16 shed. four skids on the pad, joists across them, two rim joists.Open this design

How many skids, how far apart

The designer takes the shed width in feet, divides by 4, rounds up and adds 1, with a minimum of two skids. The spacing works out as follows, measured center to center.

Shed width Skids Spacing
6 ft 3 34-1/4 in
8 ft 3 46-1/4 in
10 ft 4 38-13/16 in
12 ft 4 46-13/16 in
14 ft 5 41-1/8 in
16 ft 5 47-1/8 in

The skids are as long as the shed is deep. A 10x12 shed sits on four 12 ft skids. The shed on skids guide covers the floor build on top of them.

Tie-downs

A shed on a gravel base is held down by its own weight and by whatever you fasten it to. The designer’s parts list includes four earth auger anchors, 30 inches or longer with a holding rating from their maker, one at each corner cabled around the outside skid, with a note that four anchors are not a high-wind tie-down. Elgin’s guide, quoted above, accepts a gravel base only with code-approved tie-downs, and Prince William County requires anchoring for wind loads. Ask your building department which tie-downs it approves for a shed on skids, and follow the maker’s instructions for whatever anchor you buy. The guide to anchoring a shed goes through the options by foundation.

Kits and prefab sheds

If you are setting a prefab shed on the pad, its manual sets the base size. The Duramax 4x8 Sidemate manual, for example, says the base should be at least 4 inches larger than the shed and that the shed must be firmly anchored to its pad. That is one resin shed’s rule, not a rule for a wood shed built from our plans.

Common gravel base mistakes

Most gravel base problems show up a year later as a door that binds or a floor that stays damp. They are easy to avoid at the start.

Using the wrong stone

Round pea gravel and rounded river rock do not lock together. Order compactable crushed stone from an aggregate supplier and describe the job to them.

Buying the whole pad in bags

At the prices above, bagged base costs about five times bulk stone for a 10x12 pad, and 152 bags is a long afternoon of lifting. Order by the yard or the ton unless the truck cannot reach the spot.

Making the pad too small

A pad that ends at the wall leaves the outer skids and rim joists at the very edge of the stone, with no margin for runoff and no room to work. Keep the 12 inches on every side.

Dumping it all in one lift

Six inches of loose stone dumped at once compacts at the top and stays loose below. Spread it in lifts and compact each one, as the plan’s steps do.

Skipping the compaction

Loose stone settles unevenly, and the skids follow it down. Compact every lift, and check level again after the first heavy rain.

Ignoring drainage

Level is not the same as dry. Slope the ground away from the pad and keep the stone above the surrounding grade.

Forgetting the rules

Foundation rules and permit thresholds differ from town to town, and a shed of any size can be subject to zoning and setbacks even where it needs no building permit. Call first.

Plan the shed that goes on the pad

The gravel pad is the first job of the build. When it is level and compacted, the floor frame goes on top of the skids, then the walls and the roof. Open the shed designer, set your size, and it sizes the pad, counts the stone and the skids, and lists every board with store prices, free. The plan PDF, a single payment, adds the foundation and floor framing sheet with every skid and joist position, the cut list, the priced shopping list and the build steps for your size. How to build a shed walks through every stage with the numbers for an 8x10, and the 10x12 gable shed plan and 12x16 gable shed plan are ready to open.

Sources

Every number in this guide that does not come from our own shed designer was checked against these 15 documents, numbered in the order the text first cites them and read between Sep 29, 2026 and Nov 20, 2026. 12 are codes, agencies, makers and stores; 3 are secondary sources (shed sellers' and builders' guides), marked, used only where no code, agency or maker gives a number.

  1. 1Penn State Center for Dirt and Gravel Road StudiesDGLVR Materials Calculator
  2. 2Penn State Center for Dirt and Gravel Road StudiesDriving Surface Aggregate tech bulletin (2025)
  3. 3HomeGuideSecondary sourceHow Much Does a Concrete Slab Cost? (Feb 2026)
  4. 4HomeGuideSecondary sourceHow Much Does Crushed Stone or Gravel Cost? (Dec 2025)
  5. 5North Carolina Department of TransportationStandard Specifications (2012), Table 1005-1: Aggregate Gradation, Coarse Aggregate
  6. 6City of Elgin, IllinoisQuick Guide: Shed
  7. 7Common Ground Alliancecall811.com
  8. 8Duramax (manual hosted by Sheds For Less Direct)4x8 Sidemate Shed assembly manual
  9. 9East Coast Lumber & Building Supply, East Hampstead, NH3/4 in Crushed Stone, Cubic Yard, product page
  10. 10Grant County, WashingtonExempt R105.2 (2021 International Residential Code, section R105)
  11. 11Preserved WoodSpecifying with AWPA Use Categories for Construction
  12. 12Prince William County Development Services, VirginiaGuidelines for Building a Shed
  13. 13SitePrepSecondary sourceHow to Build a Gravel Shed Foundation
  14. 14The Home Depot, Hamilton Mill store (ZIP 30011)Pavestone 0.5 cu. ft. Paver Base, product page, and the Z-flashing search
  15. 15U.S. Forest Service (hosted by the FHWA)Equestrian Design Guidebook for Trails, Trailheads, and Campgrounds, chapter 6

Questions

Anything else? Write to us or browse every guide.

Questions people ask

Yes, for most backyard sheds on flat or gently sloped, well-drained ground. Compacted crushed stone sheds water, gives the skids a firm level bed and needs no concrete. Very soft ground, steep slopes and heavy workshop buildings call for another foundation, and your local building department has the final say.

Common practice is at least 4 inches of compacted crushed stone, and 6 inches on soft or wet ground. The designer's math assumes 4 inches once compacted and orders a third more loose stone. Requirements differ from one town to the next, so ask your building department before you order stone.

Angular crushed stone, never round pea gravel. A crushed base with fines, sold as crusher run or aggregate base, packs into the firmest bed; clean No. 57 stone, about 1 inch and down with almost no dust, drains fastest but stays looser. Tell your supplier it is a compacted shed pad and ask which they stock.

About 152 bags of 0.5 cubic foot base for the 2.8 cubic yards of loose stone a 4 inch pad under a 10x12 shed takes. At $6.47 a bag that was $983.44 at one Home Depot store, five times the $195.86 the same volume cost delivered in bulk from one supplier, before the delivery fee.

For most wood sheds, a compacted gravel pad with treated skids. For a 10x12 the stone was under $200 in bulk at one supplier before delivery, against $720 to $960 for a hired 4 inch slab at HomeGuide's 2026 rate. Deck blocks under beams can cost even less on firm, level ground.

The floor frame should not. Set pressure-treated skids, rated for ground contact, on the compacted stone and build the floor on them, so air moves under the joists and nothing but treated wood touches the pad. A resin or metal kit with its own floor follows its maker's base rules instead.

Not for a shed pad. Pea gravel is round, and round stone rolls instead of locking together, so it never compacts into a firm bed for the skids. Two inches is also half the 4 inch common practice. Use angular crushed stone at 4 inches or more once compacted.

2.07 cubic yards once compacted, for a 12x14 ft pad 4 inches deep. Order about 2.8 cubic yards of loose stone to end up there, which at HomeGuide's 1.4 to 1.5 tons per cubic yard is roughly 3.9 to 4.2 tons. At 6 inches deep the compacted volume rises to 3.11 cubic yards.

Design it, then build it

Your backyard deserves a shed that fits.

Change the size, the roof, the doors and the windows. The span checks, the wall bracing and the materials list follow every change. Free, no account.

Design my shed, free
Designing
Free
Builder's plan
$35 once
Account
Not needed
A finished board-and-batten gable shed with double doors at sunsetIllustration