The short answer
For a typical storage shed, build a 4 inch compacted gravel pad that runs a foot past the shed on every side, set ground-contact pressure-treated 4x6 skids on edge no more than 4 ft apart, and build a 2x6 pressure-treated floor frame on top at 16 inches on center. An 8x10 shed needs 3 skids and about 2.0 cubic yards of loose gravel for a pad of 1.5 cubic yards once compacted.
Most shed problems that show up years later start at the bottom: a door that binds because one corner settled, a floor that stays damp because it sits on dirt, a frame that was never square so the roof sheathing never lines up. None of that is hard to avoid. A good shed foundation needs three things: it must be flat, it must keep the wood dry, and it must give you a square frame to build on.
This guide covers the two floating foundations our designer draws: pressure-treated skids on a gravel pad, and beams on concrete deck blocks. The numbers come from the same engine as our shed designer, which works them out for any size.

Skids, blocks or concrete
All three work. The choice comes down to your ground, the size and weight of the shed, and what your building department accepts. For slab thickness, paving slabs, plastic grids and timber frames, with quantities in feet or metres, see the shed base guide.
| Foundation | Best for | Watch for |
|---|---|---|
| Skids on gravel | Flat or nearly flat ground and storage sheds. The simplest to build. | Needs a flat pad; skids must be ground-contact pressure-treated lumber. |
| Beams on deck blocks | Gentle slopes, since each block can be set at its own height. | Each block needs firm, compacted ground under it; more points to level. |
| Slab or piers | Heavy workshops, sheds with plumbing, or where a permanent foundation is required. | More work, and your building department may want footings below its frost depth. |
Skids and blocks are called floating foundations: the shed rests on the ground instead of being anchored below the frost line. They move a little with the seasons, and a light timber building shrugs that off. The model code agrees for small sheds: section R403.1.4.1 of the 2021 International Residential Code1 does not require frost protection for a detached light-frame accessory building up to 600 sq ft with eaves no higher than 10 ft. Your jurisdiction sets its own frost depth and can ask for more. If you want to add plumbing or plan to heat the building, talk to your building department before you pick one. Our permit basics guide explains what to ask.
Calculator
Shed base calculator
Enter the shed's floor size, pick a base, and get the materials for it. Works in feet and inches or in metres; the calculator remembers your choice on this device.
You need
The calculator above gives the gravel, concrete, deck blocks, pavers, plastic grid tiles or timber for a 10x12 floor, and you can change the size and the base type. Check the numbers against the plan for your own shed, then order.
Which base for your size
Small and light sheds forgive a lot. As the floor gets bigger and heavier, the base matters more, and each type has its own guide with the quantities worked out:
- Gravel shed base: the usual pad under skids, for most storage sheds on flat ground.
- Concrete block shed foundation: for gentle slopes, with block counts and spacing for each size.
- Concrete slab shed foundation: for heavy workshops, or where a permanent foundation is required.
- Shed on skids: how the timbers and floor frame sit on the pad.
Pick and prepare the site
Before you buy any lumber, walk the spot after a heavy rain. Water that pools there will pool under your shed. Look for:
- Drainage. High ground is better than low ground. If the only spot is low, raise the pad with more gravel and slope the soil around it away from the shed.
- Room to work. Leave enough space around the shed to stand and put up siding and trim, and later to paint it.
- Setbacks. Towns set minimum distances from property lines and often from other buildings. Check them now, not after the pad is down.
Safety
Call 811 before you dig
Call 811 a few business days before you dig. It is free, and it keeps your shovel away from buried lines.
Plan the gravel pad one foot bigger than the shed on every side. For an 8x10 shed that is a 10x12 pad, and at 4 inches deep once compacted it holds about 1.5 cubic yards of gravel. Crushed stone loses about a quarter of its loose depth when you compact it (Penn State's4 road-aggregate guidance compacts an 8 inch loose lift to 6 inches), so the designer's list orders a third more: 2.0 cubic yards of loose stone. A 12x16 shed needs a 14x18 pad, about 3.1 cubic yards compacted and 4.2 to order. Buy crushed stone with angular faces, not round pea gravel. A U.S. Forest Service design guide puts it plainly: crushed rock compacts relatively well, while round gravel does not, because the stones roll against each other.
Measurements
The 8x10 gable, as the designer draws it
- gravel pad
- 10 × 12 ft
- 4 in deep, 12 in past the shed on every side
- gravel to order
- 2.0 cu yd
- 1.48 cu yd compacted in place
- skids
- 3 × 120"
- 4x6 PT, on edge, front to back
- between skid lines
- 46-1/4"
- center to center
Carpenter's tip
Level the pad, not the dirt
Do not try to get the soil perfect. Get it roughly flat and firm, then do the fine leveling in the gravel with a long straight 2x4. Gravel is much easier to move by a quarter inch than clay is.
Build a skid foundation
Skids are long pressure-treated timbers, usually 4x6, that run front to back under the shed. Set them on edge, with the 5-1/2 inch face vertical: that is the stiff way, and it lifts the floor frame further off the gravel. Use lumber treated for ground contact (AWPA use category UC4A), not the above-ground grade. The model code requires ground-contact treated wood wherever wood touches the ground under a building people occupy (section R317.1.2), and it is the right grade for skids either way.
Space the skids so the floor joists never span more than about 4 ft between supports. On an 8 ft wide shed that means three skids, about 46-1/4" apart. A 12 ft wide shed gets 4 skids about 46-13/16" apart. At that spacing a 2x6 joist at 16 inches on center is loafing: the designer checks it at a 50 psf floor load against the span divided by 360, the deflection limit the model code sets for floors, and a 2x6 is good for about 7' 7-3/8".
Stage 1 of 6about 8 h
Gravel pad and skids
Stage 2 of 6about 5 h
Floor frame and deck
Mark the footprint
Drive stakes at the four corners of the pad, one foot outside the shed on every side, and run string between them.Strip and dig
Remove sod and topsoil inside the strings until you reach firm subsoil, and rake the bottom flat.Lay fabric and gravel
Roll out landscape fabric, then spread crushed gravel in two layers, compacting each one, until you have the 4 inches of compacted gravel the designer plans.Level the pad
Screed the gravel with a straight 2x4 and check it with a level in both directions until it is flat.Set and level the skids
Place the pressure-treated skids on edge at the spacing from your plan, then level each one along its length and against its neighbors.Build the floor frame
Nail the joists between the two rim joists at 16 inches on center, then set the frame on the skids.Square the frame
Measure both diagonals and rack the frame until they match, then toenail or strap the frame to every skid.Glue and fasten the subfloor
Run construction adhesive on the joists and screw down 3/4 inch tongue-and-groove plywood, long edges across the joists.
For the 8x10 the floor frame is 9 joists at 93" long between two rim joists at 10'. The rim joists run the same direction as the skids and the joists run across them. Nail each joist through the rim with three 16d common nails (3-1/2 x 0.162 inch) or four 3 x 0.131 inch nails at each end, which is what the model code's fastening schedule calls for, or use joist hangers if you prefer. The free 8x10 gable shed plan lists every piece and how to cut it from standard lumber.
Check before you continue
Keep a gap under the floor
Air under the floor is what keeps it dry. With skids on edge you get about 5-1/2 inches between the gravel and the joists. Do not pile gravel, mulch or soil against the skids or the rim joists later on. The designer starts the siding 6 inches above the gravel, the clearance the model code asks of wood siding, so keep that strip clear too.
Build on concrete blocks
On a slope, a block foundation is easier than trying to build a level gravel pad. Solid concrete deck blocks with a notch on top hold 4x4 beams, and the beams take the place of skids. The designer places the beams at the same spacing as skids and puts blocks under each beam as close as the 4x4 needs to pass its span check, never more than 4 ft apart, which works out to 12 blocks for an 8x10.
- Dig out the topsoil under every block and set each one on a few inches of compacted gravel.
- Set the highest block first, then bring the others up to it with more compacted gravel. Avoid stacking loose shims.
- If the low side would need a tall stack of blocks, a gravel pad or a pier is a better choice.
- Lay the beams, check them with a level along their length and across to each other, then build the floor frame on top exactly as for skids.
The concrete block shed foundation guide has the block count and spacing for every size, and the shed floor guide covers the frame that goes on top.
Foundation kits, ground screws and pavers
Not every base is poured or built from lumber. Four ready-made options come up often, and each has a place.
Plastic grid kits
Snap-together plastic grids sit on landscape fabric and are usually filled with gravel. They suit small, light sheds on ground that is already flat and firm, and they save you from cutting and leveling timber. Capacity comes from the maker, not from us: one UK maker, Ecobase, lists its Fastfit grid at 2.4 tonnes per square metre on the Tiger Sheds product page (read October 2026), and ratings differ between brands. Match the rating to the weight of your shed plus what you will store in it.
Adjustable beam and foot kits
These use beams on adjustable feet, so you can level the frame on a gentle slope without stacking shims. They work like the block foundation above: each foot needs firm, compacted ground under it, and the more points you have, the more you have to level. Read the maker's span and load limits before you pick one.
Ground screws
Steel screws turned into the soil carry a beam or frame on a few points, with no digging and no concrete. They are used where a gravel pad is hard to build, such as on a slope or on roots. Holding power depends on the screw, the soil and the depth, so use the maker's published rating for your soil and call 811 before you drive any screw.
Pavers and paving slabs
Patio pavers or paving slabs on a bed of compacted gravel make a flat, neat base for a light shed. Every slab must sit solid, so compact the bed and check the level across the whole footprint. The calculator above counts slabs for any size.
Our designer draws the two foundations behind most of these ideas: skids on a gravel pad and beams on deck blocks, with the materials listed for your size. When you shop for a kit, a pack of ground screws or a stack of pavers, use that plan as the shopping list.
Metal and resin sheds
Metal and resin sheds come in two kinds: some include a floor, and many do not. Read the maker's manual before you buy a base. The idea is the same as for a wood shed: a flat, firm, well-drained pad that keeps the walls and floor out of standing water. What changes is the anchoring, because these buildings are light and catch the wind. Use the anchor kit or fixing points the manufacturer specifies, and read our guide to anchoring a shed for the ground options.
Level and square
A frame that is out of square by half an inch at the floor will be out by the same amount at the roof, and the sheathing will show it. Square it now, while it is easy to push around.
Check before you continue
Before the subfloor goes on
- Diagonals. Measure corner to corner both ways. When the two diagonals are equal, the frame is square. For an 8x10 frame they should both read 12' 9-11/16".
- The 3-4-5 check. From one corner, mark 3 ft along one side and 4 ft along the other. The distance between the marks should be exactly 5 ft.
- Level. Put a 4 ft level on a long straight board and check across the joists in several places. Fix any low skid now, not after the walls are up.
Once it is square, fasten the frame to the skids or beams so it cannot shift while you sheath the floor.
Anchor the shed
A floating shed is heavy, but a strong wind gets under a light one. Ground anchors near each corner, strapped to the floor frame, are cheap insurance, and some places require them: Elgin, Illinois, accepts a gravel base only with code-approved tie-downs, and Prince William County, Virginia, lets a small shed skip a permanent foundation only if it is anchored against wind. The designer adds four to the materials list for skid foundations: earth auger anchors 30 inches or longer, with a holding rating published by their maker, each cabled around the end of an outside skid, with a note that four anchors are not a high-wind tie-down. With blocks, fasten the beams to the blocks and the frame to the beams. Ask your building department what anchoring they expect in your area.
Ready for the walls? How to frame shed walls picks up right where the subfloor ends. Or open the shed designer to get the foundation, floor and framing for your own size.
Sources
Every number in this guide that does not come from our own shed designer was checked against these 11 documents, numbered in the order the text first cites them and read between Sep 29, 2026 and Oct 29, 2026. 10 are codes, agencies, makers and stores; 1 is a secondary source (shed sellers' and builders' guides), marked, used only where no code, agency or maker gives a number.
- 1International Code Council2021 International Residential Code, Chapter 3: Building Planning
- 2International Code Council2021 International Residential Code, Chapter 4: Foundations
- 3International Code Council2021 International Residential Code, Chapter 6: Wall Construction
- 4Penn State Center for Dirt and Gravel Road StudiesDriving Surface Aggregate tech bulletin (2025)
- 5City of Elgin, IllinoisQuick Guide: Shed
- 6Common Ground Alliancecall811.com
- 7Preserved WoodSpecifying with AWPA Use Categories for Construction
- 8Prince William County Development Services, VirginiaGuidelines for Building a Shed
- 9Southern Pine Inspection BureauNominal Vs Actual Lumber Sizes
- 10Tiger ShedsSecondary sourceEcobase Fastfit plastic shed base
- 11U.S. Forest Service (hosted by the FHWA)Equestrian Design Guidebook for Trails, Trailheads, and Campgrounds, chapter 6